Log in 1.888.499.7772
Request a Demo Get a Quote
**
Thrive Efficiency Realized
Skip to content
MENUMENU
  • Downtime Tracking
  • OEE
    • Overall Equipment Effectiveness
    • The OEE Journey
    • OEE FAQ
    • Automated Production Reporting
  • Benefits
    • Benefits of Thrive
    • Testimonials
  • Support
    • Thrive Support
    • New Features
    • Installation
    • How-To-Videos
    • Blog
    • FAQs
    • Academy
  • Pricing
  • Contact
  • Support
    Support
  • New Features
    New Features
  • Installation
    Installation
  • How-To-Videos
    How-To-Videos
    • Shift Reports
      Shift Reports
    • Up-time
      Up-time
    • Reason Code Development Tutorial
      Reason Code Development Tutorial
    • RCM: Add Reason Codes
      RCM: Add Reason Codes
    • RCM: Delete Reason Codes
      RCM: Delete Reason Codes
    • Downtime Alerts
      Downtime Alerts
    • Operator: Assign Reason
      Operator: Assign Reason
    • Operator: Splitting
      Operator: Splitting
    • Operator: Merging
      Operator: Merging
    • Planned Downtime
      Planned Downtime
    • View Actual Counts
      View Actual Counts
    • Add Shift Periods
      Add Shift Periods
    • Exporting Data
      Exporting Data
    • Daily Digest Management
      Daily Digest Management
thumbnail post
Operator: Splitting Downtime

The following video tutorial shows the process of splitting a downtime event in the operator interface.

Posts navigation

splenda

"A few months after installing the Thrive Downtime Tracking System"

we identified several key issues with our manufacturing line. Once corrected, our efficiency sky rocketed from 39% to 75%.

- Pat Kinnee, Splenda Continuous Improvement Engineer
Lassonde-Pappas-Logo-e1478325455634-min

"We're currently running 8% better than our budgeted throughput standards, "

so I consider it a win. Now we’re in a position where our other plants are interested in implementing the software.

- Pete Szelwach, Plant Manager at Lassonde Pappas and Company, Inc.
Page-1-Image-3

"We've been using Thrive for about a year with impressive results. "

Changeovers that used to take 33 minutes now only take 23. With around two each day, that time really adds up. Before using the software, we were 20 minutes into our morning shift before lines started running, and we’ve cut it down to just 8 minutes. Overall efficiency has spiked from around 45% to an average of 60%. Seeing the data has really helped us create a culture of ownership and accountability. Everyone watches the measurements and does their best to make sure things are running efficiently, because they can see the impact. With the help of Thrive, we’ve had zero overtime during our busy season. That’s a company first! Now that we’re meeting production goals, we can be proactive and schedule time to take lines down for preventative maintenance.

- Rollie Everson, Maintenance Supervisor, Amsoil
Page-1-Image-4

"We were ready to pay $250,000 for a downtime system when by accident we stumbled across Thrive MES on the internet"

“Not only did it offer everything the more expensive system did but it is a fraction of the price. We were even able to customize to our facility far within our budget.”

”After 2 years I was still able to teach them a few big things about the software that they didn’t know about. A recent major success they had was they were able to reduce their downtime by 17 whole shifts per year by making a small tweak in a process. Instead of stopping a machine to make a fabric slice for 1 minute, they slowed the machine down to make the slice while the machine was moving. They also noticed how much downtime changeovers caused so their scheduled department reduced their changesovers from 6 to 1 per week.”

- Steve Kaiser, Operations Manager, Sage Products

"Within 2 weeks their automated machines saw an increased efficiency by 20%"

by giving the operator real-time visibility, they took more ownership and responsibility for the machine’s output. As a result, it made the operator think twice about shutting down the line. ‘Can I correct this issue without shutting the machine down?

- John Batten, President, NHI Pullies Inc

"We've been able to cut our overtime by 60%"

as we identified that our change overs were the main source of downtime. Using this data to determine and implement solutions we were able to move from 12 hours shifts to 8 hour shifts. It also helped us reduce our quality issues by identifying sources of inefficiency.

- Mark Hennigan, Director of Operations, CHG
Page-2-Image-10

"We are really happy with it and love the planned downtime function."

The planned downtime function immediately identified excessive breaks and created accountability for the line running. Management now has real-time data.

- Keith Frazier, Maintenance Supervisor, Skyline Steel
Page-2-Image-7

"The real-time data"

in our break rooms and on our supervisor’s computers have created a real sense of urgency and ownership to improve our plant’s performance. You can’t argue with a 50 inch TV in the break room that updates every second.

- Jerry McConnell, Lineage Logistics
Previous Next

Ready to Thrive?

Schedule a 35 Minute Demonstration

FREE Demo
Thrive Efficiency Realized
  • Downtime
  • Pricing
  • Support
  • Contact
  • Request a Demo
  • Get a Quote
  • Log In
Privacy Policy
Thrive Efficiency Realized
| Website Design Toledo by InfoStream Solutions